Park & Recreation Offices
Roof
LPR
Steel Framing
Light Gauge Truss System
Overhead HVAC
Terrace
Hallway
Community Room
El Camino Real Lobby
Fireproofing
LPR Park Entry
Concrete Pour
Post Concrete Pour
LPR Exterior
LPR Garage
Steel Building
Steel Decking
Rebar and Steel Decking
Council Chambers Slab on Grade
Concrete Slab
Stair 1 Installation
Overhead MEP and Steel Framing
Wall Layout
Steel Structure
Below Grade Waterproofing
Rebar Installation
Waterproofing Membrane
MEP Within Slab
LPR Level 2
Steel Erection
Below Grade Plumbing
Welding
Steel Installation
Crane
LPR Steel Structure
LPR Site
Below Grade MEP
Shotcrete
LPR Building Pad
Steel Delivery
Chipped Production Piles
Elevator Pit
Joint Trench
Excavation
Auger Cast Piles
EPS Foam Installation
Production Piles
Dust Control
Building Pad
Joint Trench Within LPR Site
Utilities in Geofoam Area
Auger Cast Pile
Test Pile Preparation
Geofoam Installation Complete
Drilling Piles
Shoring Wall Along ECR
Shoring Wall Excavation
Geofoam Installation
Shoring Wall
Completing Geofoam Installation
Tiebacks in Shoring Wall
Tiebacks
Manhole within Geofoam
Excavation of LPR Building Pad Building Pad
Auger Cast Test Piles
Hillside Along ECR
BART Access Road
Grading and Excavation
Shoring Bench
Sewer Pipe
Storm Drain
Storm Drain Utilties