Thank you to everyone who completed the survey!
After reviewing the survey results and comments, we prepared a summary of findings and provided direction to the design team.
SURVEY RESULTS
- Similar to the April 14 Community Workshop, there was overall support for the park improvements, including the addition of a picnic area and the leveling of the sport court.
- There were some inquiries about barbecues. Parks staff is concerned about the litter and fire risk created by installing permanent barbecues.
- Some neighbors requested a dog play area but there is no feasible space within the park for a dedicated dog area.
- More sitting areas were requested – these are not shown in the drawings but will be added in their existing location along Dundee Drive.
- Street lighting is an issue that we will review with the Public Works Department.
- Better shade will be created with additional tree planting and the coverage of integral shade elements on the playground components.
- There were concerns about court conflicts between basketball users and trike/bike/scooter users. Having a multiple use court has worked in other parks and are typically used on a first-come, first-served basis.
PLAYGROUND
- Option 2 was preferred over option 1, but there were several requests to combine the best features of both designs.
- Given the small size of the park, there is a general feeling of maximizing the play elements within the footprint of the playground.
- There is support for both the balloon playground but also the sail playground, so the landscape architect has used one of each as shown in the below images.
- Bright and light colors were popular.
- Toddler swings instead of a group swing is preferred due to safely concerns and a need to focus on younger children.
CURRENT STATUS
We are waiting for pricing from the contractor. We hope to attend the August 19 Parks and Recreation Commission meeting to provide an update on design and construction. If the construction costs are negotiated within the next two weeks, we plan to bring the project to City Council for award on August 27, which would allow construction to start in October. We will provide more updates as they become available.